Emily Warren Roebling (1843-1903) mastered stress analysis, mathematical calculations, and cable construction techniques to become the first woman to effectively serve as chief field engineer on a major American infrastructure project. In 1870, when her husband Washington succumbed to decompression sickness from working in underwater caissons, she stepped into the breach to oversee the construction of what would become the world’s longest suspension bridge – the Brooklyn Bridge – for eleven critical years. Her ability to translate complex engineering principles into practical construction decisions saved the bridge from potential abandonment and established new precedents for women’s participation in technical fields.
Today, as we witness women leading major infrastructure projects worldwide whilst fighting persistent gender disparities in engineering, Emily’s story offers both inspiration and hard-won wisdom about overcoming institutional barriers through technical competence and quiet determination.
Welcome, Mrs Roebling. It’s an extraordinary honour to speak with you. You’ve been described as the woman who built the Brooklyn Bridge, though I suspect you’d have words about that phrasing.
Indeed, I should. I completed the Brooklyn Bridge, guided it through its most treacherous years, but I did not design it. That was the genius of my father-in-law, John Roebling. What I did was ensure his vision – and Washington’s refinements – became reality when circumstances demanded it. The press of my time found it easier to call me “the woman behind the man” rather than acknowledge I possessed engineering knowledge in my own right.
Tell me about those early days when you first encountered the world of engineering through your marriage to Washington.
In 1865, when I married Washington, I entered a household where engineering was not merely profession but passion. John Roebling was already conceiving his greatest work – a bridge across the East River that would dwarf any suspension span yet built. Before the project truly began, Washington and I travelled to Europe to study caisson construction, those great wooden chambers that would be sunk beneath the river to create foundations for the towers.
During our months abroad, I wasn’t merely a wife accompanying her husband. I studied everything – the mechanics of pneumatic chambers, the behaviour of compressed air, the calculations governing load distribution. Call it curiosity, call it necessity, but I absorbed it all. When we returned with our infant son in 1867, and John’s accident claimed his life that same year, I was already more prepared than anyone knew.
The technical challenges of the Brooklyn Bridge were unprecedented. Could you walk our readers through the most critical engineering decisions you oversaw?
The bridge demanded innovations at every turn. Consider the caissons alone – timber chambers measuring 168 by 102 feet, designed to sink beneath the riverbed whilst men worked inside under compressed air. The Brooklyn caisson was ultimately stopped at about 44.5 feet below high-water after fire damage and obstructions, while the Manhattan caisson continued to roughly 78.5 feet before work was halted due to decompression-sickness risks and the determination that the dense overlying strata would provide sufficient bearing.
Each caisson required air pressure of 21 pounds per square inch on the Brooklyn side, and up to 35 pounds on the Manhattan side – nearly two and a half times normal atmospheric pressure. I had to understand not merely the numbers, but their consequences: how compressed air affected human physiology, how we might modify working schedules to protect our men, when to accept calculated risks against structural necessity.
When Washington fell victim to caisson disease in 1870, I became the bridge between his engineering knowledge – trapped in his sickroom – and the brutal realities of construction. Every morning, I would review plans with him through our discussions, then spend my days on-site, translating his guidance into practical decisions whilst learning to make critical choices myself.
Can you explain the cable construction process? This was revolutionary engineering for its time.
Certainly. Each of the bridge’s four main cables contains 5,434 parallel wires, bundled into 19 strands of 278 wires each. The wires themselves were number 8 Birmingham gauge – roughly 0.165 inches in diameter – made of crucible steel, not the untested Bessemer steel many advocated.
The spinning process began in 1877. We established a traveller wire between the towers, then used that to guide the laying of individual wires in a continuous process. Men would ride a small wheel along the traveller, unreeling wire from Brooklyn to Manhattan and back, building the cables one wire at a time. Each complete loop took approximately ten minutes.
But here’s what the official records don’t capture: I personally inspected wire quality, having learned to detect inferior steel by touch and sound. When contractor J. Lloyd Haigh attempted to substitute substandard wire, I was among the first to recognise the fraud. We estimated 221 tons of rejected wire had already been incorporated, reducing our safety factor from six to five. I insisted Washington add 150 additional wires to each cable – a decision that likely prevented catastrophic failure.
That’s remarkable technical knowledge. How did you acquire such expertise without formal engineering training?
Through necessity, determination, and what I’ll call “warfare by mathematics.” Each evening, Washington would explain principles – stress analysis, catenary curves, material strengths – whilst I worked through calculations by lamplight. I studied every engineering text in his library, corresponded with other engineers, and most importantly, observed construction daily.
Within two years, I could calculate wire tensions, assess foundation stability, and evaluate contractor proposals. I learned to read the bridge like a language – understanding how environmental conditions affected cable behaviour, how seasonal temperature changes required adjustments to construction schedules, why certain steel suppliers produced superior materials.
The men on-site initially regarded me with suspicion, naturally. But when my technical decisions proved sound – when my identification of the wire fraud saved the project, when my modifications to working conditions reduced caisson disease cases – respect followed. I earned credibility not through credentials, but through competence.
You mention caisson disease. This must have been devastating to witness, particularly as it affected your husband.
Caisson disease – what physicians now call decompression sickness – was our invisible enemy. Washington suffered terribly: partial paralysis, hypersensitivity to light and sound, loss of speech at times. For months, he could barely communicate beyond whispered words.
The disease manifested differently in different men. Some experienced “the bends” – excruciating joint pain. Others suffered “the staggers” – vertigo, breathing difficulties. The most severe cases, “the chokes,” were often fatal. We lost good men to this mysterious affliction.
I instituted shorter shifts in the caissons, improved ventilation where possible, and insisted on gradual decompression – though we lacked proper understanding of the mechanisms involved. My decisions were based on careful observation: which workers remained healthy, under what conditions symptoms appeared, how we might modify procedures to protect lives whilst maintaining progress.
What frustrated me most was the medical community’s dismissive attitude. Many physicians considered it malingering or hysteria. I knew better – I’d seen strong men reduced to helplessness, including my own husband.
There’s been some historical debate about how much of the bridge’s design and construction should be attributed to you versus Washington. How would you set the record straight?
This question troubles me, for it suggests a false choice. The Brooklyn Bridge represents a collaboration forged by necessity and strengthened by shared dedication. Washington’s engineering knowledge, learned at his father’s side and expanded through formal study, provided the foundation. My contribution was translating that knowledge into daily decisions, managing the political complexities, and yes, making independent technical judgements when circumstances demanded.
Did I redesign the bridge? No. Did I make critical modifications to construction procedures, cable specifications, and working conditions that ensured its completion? Absolutely. The bridge that stands today reflects both our expertise – his theoretical grounding, my practical adaptations.
History has a tendency to seek singular heroes, particularly male ones. The truth is messier: the Brooklyn Bridge exists because two people, bound by marriage and common purpose, refused to abandon an impossible dream.
Let’s discuss one of your professional mistakes. What would you approach differently with today’s knowledge?
The wire fraud incident haunts me still. Though we detected Haigh’s substitution of inferior steel, I initially advocated for complete replacement of the contaminated cables. Washington, weakened by illness, agreed. However, the Bridge Company’s board, influenced by political considerations, opted for compromise – adding extra wires rather than rebuilding.
In retrospect, I should have fought harder for complete replacement. My calculations showed the modified cables would be safe, but “safe” and “optimal” are different standards. I yielded to political expediency when engineering principles demanded absolute integrity.
This taught me a hard lesson about the intersection of technical and political decision-making. Engineers cannot afford to be naive about the forces that shape our work. Sometimes, fighting harder for technically superior solutions – even at great personal cost – serves the greater good.
How do you view women’s progress in engineering today? What advice would you offer to young women entering technical fields?
The progress astounds me. Women designing skyscrapers, leading major infrastructure projects, advancing materials science – it’s precisely what I dreamed possible during those solitary hours studying bridge specifications.
Yet the fundamental challenge remains: proving competence in environments that question your presence. My advice is threefold. First, master your technical foundations thoroughly. No one can dismiss superior knowledge, however reluctantly they acknowledge it. Second, document everything. Your contributions will be forgotten or attributed to others unless you create an undeniable record. Third, find ways to make your work indispensable. I succeeded because the bridge literally could not proceed without my involvement.
But here’s what troubles me about modern discourse: the tendency to frame women’s achievements as extraordinary rather than professional competence applied consistently. I didn’t build the Brooklyn Bridge through feminine intuition or special sensitivity – I built it through rigorous application of engineering principles, mathematical analysis, and practical problem-solving. We advance not by celebrating women’s “different” contributions to engineering, but by recognising our equal capacity for technical excellence.
One final question: When you first walked across the completed bridge in 1883, what were your thoughts?
I carried a rooster as a symbol of victory, which seemed appropriate then – though rather theatrical in retrospect. But as the carriage wheels rolled across those deck planks, I wasn’t thinking of symbolism or celebration.
I was listening to the bridge – the subtle sounds that told me the cables were bearing loads properly, the deck responding to wind as designed, the entire structure performing exactly as our calculations predicted. Every creak, every vibration confirmed that years of midnight calculations, difficult conversations with contractors, and impossible technical decisions had produced something both beautiful and permanent.
The Brooklyn Bridge stands not merely as engineering achievement, but as proof that knowledge, properly applied, transcends the accidents of birth or social expectation. That lesson remains as relevant today as it was in 1883.
I trust future generations will judge us not by the barriers we faced, but by the bridges we built despite them.
Thank you, Mrs Roebling, for sharing your remarkable story with us today.
The pleasure was entirely mine. May your readers build bridges of their own.
Letters and emails
Following our conversation with Emily Roebling, we’ve received an overwhelming response from readers eager to explore her remarkable story further. We’ve selected five letters and emails from our growing community who want to ask her more about her life, her work, and what she might say to those walking in her footsteps.
Larissa Carvalho (32, Structural Engineer, São Paulo, Brazil)
Mrs Roebling, I’m fascinated by your mention of detecting inferior steel by touch and sound. Could you elaborate on these sensory techniques? In modern engineering, we rely heavily on laboratory testing and digital sensors, but I wonder if we’ve lost something valuable about understanding materials through direct physical assessment. What specific qualities did you learn to recognise, and how might today’s engineers benefit from developing similar tactile expertise?
Miss Carvalho, your question touches upon something I’ve long believed the engineering profession has abandoned to its detriment. When I speak of detecting inferior steel by touch and sound, I refer to knowledge that was once common among craftsmen but has been relegated to mere curiosity in our rush toward scientific precision.
The wire we examined daily possessed distinct characteristics that revealed its quality. Superior crucible steel, when struck lightly with a small hammer, produces a clear, sustained ring – what the Welsh workmen called a “true note.” Inferior steel, particularly that contaminated with excessive phosphorus or sulphur, yields a duller, shorter sound, almost a thud. I learned to distinguish these tones as surely as a piano tuner recognises pitch.
Through touch, one could assess the wire’s surface integrity. Quality steel feels smooth under the fingertips, with a consistency that speaks of proper rolling. Inferior specimens often display minute irregularities – tiny ridges or soft spots that indicate uneven heating during manufacture. I would run lengths of wire through my gloved hands, searching for these telltale imperfections.
Temperature provided another crucial indicator. Good steel maintains consistent thermal properties – it warms evenly in sunlight and cools uniformly in shade. Poor steel often exhibits variations, with certain sections retaining heat longer than others, suggesting inconsistent composition.
The visual examination proved equally revealing. Proper steel displays a uniform grain structure when examined under magnification – though our equipment was primitive compared to modern standards. We relied on hand lenses and careful observation of fracture patterns when testing samples. Clean breaks showed fine, even crystalline structures, whilst inferior steel exhibited coarse, irregular patterns.
What troubles me about modern practice is the tendency to trust instruments over human observation. Certainly, your laboratory methods provide precision we could never achieve, but they operate at remove from the material itself. When I handled thousands of feet of wire daily, I developed an intimate knowledge of steel’s behaviour that no testing apparatus could replicate.
I would counsel today’s engineers to spend time with their materials – not merely reviewing specifications, but physically engaging with the substances they specify. Hold the steel, strike it, observe how it responds to environmental conditions. Such knowledge proves invaluable when laboratory results conflict with field observations, or when rapid decisions must be made without access to testing facilities.
The craftsmen who spun our cables possessed this instinctive understanding. They could detect wire tension irregularities by sound alone, adjusting their techniques accordingly. This marriage of scientific principle with practical experience produced work of extraordinary reliability – evidence that stands in the bridge’s continued service after more than forty years.
Ryan Campbell (28, Construction Project Manager, Vancouver, Canada)
You mentioned the political pressures surrounding the wire fraud compromise, where you accepted adding extra wires rather than complete cable replacement. Looking back, how do you think engineers should handle situations where political or financial constraints conflict with optimal technical solutions? I face similar dilemmas in modern projects where budget limitations force us to choose “adequate” over “ideal” – what framework did you develop for making these difficult decisions?
Mr Campbell, your question strikes at the very heart of engineering practice – the eternal tension between what ought to be done and what can be accomplished within the constraints of human frailty and financial limitation. The wire fraud incident taught me lessons I carry still.
When we discovered J. Lloyd Haigh’s deception – substituting inferior wire for the specified crucible steel – my initial response was absolute: remove every contaminated strand and begin anew. The engineer in me demanded nothing less than complete integrity. But the Bridge Company’s board faced different pressures entirely. They had already invested enormous sums, public patience wore thin after years of construction, and political enemies sought any excuse to abandon the project altogether.
I learned that an engineer’s responsibility extends beyond technical perfection to practical completion. A perfect bridge that remains unbuilt serves no one. A compromise solution that ensures public safety whilst allowing progress may be the wiser course, however it may pain our professional sensibilities.
My framework became threefold: First, establish the absolute minimum safety requirements – not the ideal, but the threshold below which no compromise is acceptable. For our cables, this meant calculating precisely how much additional wire would restore adequate safety margins. Second, document everything thoroughly. I insisted every decision, every calculation, every compromise be recorded in detail, so future engineers might understand our reasoning and make informed modifications if necessary.
Third, and perhaps most crucially, I learned to distinguish between battles worth fighting and those better conceded strategically. When the board rejected complete cable replacement, I channelled my efforts into ensuring the additional wire solution was executed flawlessly. I supervised every aspect of that remedial work personally, treating it not as a defeat but as a different path to the same destination.
The key lies in maintaining professional integrity whilst acknowledging political realities. I never agreed to any compromise that would genuinely endanger public safety, but I ceased demanding perfection where adequacy would suffice. This required brutal honesty about my own motivations – was I insisting on the ideal solution because it was truly necessary, or because it satisfied my professional pride?
The Brooklyn Bridge stands today as testament that engineered compromises, properly calculated and carefully executed, can serve the public good. Your modern projects face identical pressures, Mr Campbell. My counsel is this: know your absolute requirements, document your reasoning thoroughly, and remember that a completed project serving the public safely is worth more than an abandoned monument to engineering purity.
Fight the battles you must win, concede those you may lose.
Jamila Abdi (41, Infrastructure Policy Analyst, Nairobi, Kenya)
During your eleven years overseeing the bridge construction, you must have witnessed significant changes in both technology and society. How did you maintain your vision and motivation during such an extended project timeline? I’m curious about your thoughts on long-term infrastructure planning – particularly how engineers can design projects that remain relevant and adaptable across decades of social and technological change.
Miss Abdi, your question brings me back to those countless mornings when I would wake wondering if this would be the day we lost everything – to political opposition, financial collapse, or simple human exhaustion. Eleven years is a lifetime in engineering terms, and maintaining purpose across such an expanse requires more than professional duty.
What sustained me was understanding that the bridge represented far more than a river crossing. We were proving that American engineering could rival anything Europe had achieved, that private enterprise could accomplish what governments hesitated to attempt. Each day’s work was a statement of national capability and individual determination. When doubt crept in – and it did, particularly during Washington’s darkest periods of illness – I reminded myself that abandoning the project would validate every critic who claimed women lacked the fortitude for serious endeavour.
I developed what I came to think of as “layered purpose.” The immediate layer was daily problem-solving: ensuring adequate materials arrived on schedule, resolving disputes between contractors, making technical decisions that kept construction progressing. The middle layer was the bridge itself – creating something beautiful and functional that would serve generations. The deepest layer was proving that competence, properly applied, could overcome any obstacle, regardless of one’s expected station in society.
Regarding long-term infrastructure planning, I learned that successful projects must anticipate not merely present needs but future possibilities. We designed the Brooklyn Bridge with capacity far exceeding contemporary requirements – six lanes of traffic when most bridges accommodated two, pedestrian promenades when such amenities seemed luxury rather than necessity. This foresight has allowed the bridge to serve purposes we never imagined in 1883.
The great lesson is that infrastructure should be built for the society you hope to become, not merely the one that exists. We anticipated New York’s growth, the increase in commerce, the evolution of transportation methods. Today’s engineers face similar challenges with technologies we cannot yet envision.
Most importantly, I learned that extended projects require what I call “renewable inspiration.” Initial enthusiasm fades; one must constantly rediscover why the work matters. I found this through daily interaction with the workers, seeing their pride in contributing to something extraordinary, and through correspondence with engineers worldwide who followed our progress with keen interest.
The bridge became larger than any individual contribution – it represented collective human ambition made manifest in steel and stone. That understanding sustained me through the darkest moments and reminds me still that engineering serves purposes far beyond mere technical achievement.
Arata Nakamura (29, Urban Planning Graduate Student, Tokyo, Japan)
If you had been given complete design authority from the beginning – rather than stepping in during construction – how might the Brooklyn Bridge have been different? I’m particularly interested in whether you would have approached the integration of pedestrian and vehicular traffic differently, or if your direct experience with construction challenges might have influenced the original design philosophy. What opportunities do you think were missed by not having more diverse perspectives involved from the project’s inception?
Mr Nakamura, what a fascinating speculation. Had I possessed complete design authority from the project’s inception, I believe the Brooklyn Bridge would have emerged as a rather different creature – perhaps more practical, certainly more considerate of human needs beyond mere transportation.
My foremost change would have concerned the promenade deck. John Roebling conceived it as an elevated walkway above the traffic, which proved ingenious. However, having witnessed daily the bridge’s use patterns, I would have designed broader pedestrian spaces with more frequent resting areas and better protection from wind. The current promenade, whilst magnificent, can become quite inhospitable during winter months. I would have incorporated enclosed waiting areas at quarter-points along the span.
More significantly, I would have approached the integration of different traffic types with greater flexibility. The bridge currently accommodates horse-drawn vehicles, elevated railway tracks, and pedestrians, but the fixed nature of these arrangements limits adaptation to changing transportation needs. Had I designed the structure from the beginning, I would have created modular deck sections that could be reconfigured as technology evolved. Even in 1883, observing the rapid development of mechanical transportation, it seemed prudent to anticipate future changes.
The anchorages present another area where my construction experience would have informed original design. Having supervised their excavation and construction, I learned that the enormous stone blocks, whilst impressive, created unnecessary complications during building. I would have specified a more uniform stone size and simplified the internal structure, reducing construction time whilst maintaining structural integrity.
Perhaps most importantly, I would have insisted upon worker safety provisions that were considered excessive in John’s original plans. Having witnessed too many accidents during construction – falls, decompression sickness, equipment failures – I would have incorporated permanent safety features: better lighting in the caissons, improved ventilation systems, and mandatory rest periods for compressed air work.
The missed opportunity you mention resonates deeply. Engineering projects benefit enormously from diverse perspectives, particularly from those who understand both technical requirements and human needs. Women’s exclusion from design roles means countless projects lack consideration of how structures will actually be used by families, children, elderly persons, and others whose needs differ from those of healthy adult men.
Had more women participated in infrastructure planning from the beginning, I believe we would see bridges, buildings, and public works that serve broader human purposes. The engineering profession loses valuable insights when it draws from such a narrow pool of experience and perspective.
Katarina Horváthová (35, Materials Science Researcher, Prague, Czech Republic)
You worked during the transition from iron to steel construction, choosing crucible steel over the newer Bessemer process for the bridge cables. What was your decision-making process for adopting new materials technologies? How did you balance innovation with proven reliability? I ask because we face similar choices today with advanced composite materials and smart materials – when is it worth taking calculated risks on emerging technologies versus relying on established methods?
Miss Horváthová, your question goes to the very essence of engineering judgment – when to embrace innovation and when to rely upon proven methods. The choice between crucible steel and Bessemer steel for our cables illustrates this dilemma perfectly.
When we made that decision in the mid-1870s, Bessemer steel represented the future – cheaper, faster to produce, and increasingly popular for structural applications. However, the process remained relatively untested for suspension bridge cables, which must withstand constant stress variations unlike any other structural element. Crucible steel, whilst more expensive and labour-intensive to produce, had demonstrated reliability in smaller suspension bridges and possessed consistent quality that we could verify through established testing methods.
My decision-making process centred on three considerations: the consequences of failure, the availability of reliable testing methods, and the project’s timeline constraints. For bridge cables, failure means catastrophic collapse – not gradual degradation that allows for repairs, but sudden, complete structural failure. This reality demanded absolute confidence in our materials.
Crucible steel’s manufacturing process, though slower, allowed for better quality control. Each batch could be examined thoroughly, tested for consistency, and rejected if found wanting. Bessemer steel, produced in larger quantities with less individual oversight, presented greater variability. Given our limited ability to test large quantities of wire, I preferred the material with more predictable characteristics.
The timeline factor proved equally important. Had we chosen Bessemer steel and discovered quality problems during cable spinning, replacement would have meant years of delay. Crucible steel’s higher initial cost seemed modest compared to potential delays and reconstruction expenses.
Your modern situation with advanced materials presents similar challenges. My counsel would be to establish clear criteria: How thoroughly has the new material been tested under conditions similar to your application? What are the consequences if it performs below expectations? Do you possess adequate methods to verify its properties before and during use?
I would recommend adopting emerging technologies gradually – perhaps in non-critical applications first, where failure would be inconvenient rather than catastrophic. Build experience with new materials through smaller projects before committing them to major infrastructure.
The key lesson from our experience is that innovation should be embraced thoughtfully, not rashly. Engineering advances through calculated risks, not blind faith in novelty. When public safety depends upon your decisions, proven reliability often trumps potential improvements. Save your innovations for elements where failure can be managed, monitored, and corrected without endangering lives or compromising the entire project’s success.
Reflection
Emily Warren Roebling passed away on 28th February 1903 at age 59 in Trenton, New Jersey , her death coming just twenty years after the Brooklyn Bridge’s triumphant completion. Our conversation today reveals layers of complexity often missing from traditional historical accounts, which typically frame her as Washington’s devoted helpmate rather than acknowledging her independent engineering expertise.
Throughout our discussion, Emily challenged several persistent historical narratives. Where conventional accounts emphasise her role as liaison between her bedridden husband and construction crews, she described herself as an active decision-maker who independently assessed materials, modified construction procedures, and made critical technical judgements. Her detailed knowledge of steel properties, caisson operations, and cable construction suggests a depth of understanding that extends far beyond mere message-carrying.
The interview illuminates gaps in the historical record that deserve acknowledgement. Emily’s specific contributions to solving the wire fraud crisis, her modifications to worker safety protocols, and her mathematical calculations remain largely undocumented in official project records. Her technical education – acquired through necessity rather than formal training – represents a form of engineering knowledge that existing scholarship has yet to fully explore.
Emily’s story resonates powerfully with contemporary challenges in civil engineering, where women still represent less than 20% of the profession globally. Her emphasis on understanding materials through direct physical engagement offers valuable counterpoint to increasingly digital design processes. Modern infrastructure projects continue to grapple with the same tensions she faced between political expedience and engineering integrity, making her framework for navigating such conflicts remarkably relevant.
Her legacy has experienced gradual resurrection through feminist scholarship, with historians like Marilyn Weigold and David McCullough bringing her contributions to broader attention. The American Society of Civil Engineers now recognises her pioneering role, whilst Georgetown Visitation School honours her as an alumna who broke professional barriers.
Perhaps most significantly, Emily’s insistence that engineering serve “broader human purposes” challenges the profession to consider whose needs infrastructure truly serves. In an era confronting climate change and urban inequality, her call for diverse perspectives in design feels not merely progressive but essential. The bridges we build today – literal and metaphorical – require precisely the combination of technical excellence and human understanding that Emily Warren Roebling embodied more than a century ago.
Who have we missed?
This series is all about recovering the voices history left behind – and I’d love your help finding the next one. If there’s a woman in STEM you think deserves to be interviewed in this way – whether a forgotten inventor, unsung technician, or overlooked researcher – please share her story.
Email me at voxmeditantis@gmail.com or leave a comment below with your suggestion – even just a name is a great start. Let’s keep uncovering the women who shaped science and innovation, one conversation at a time.
Editorial Note: This interview represents a dramatised reconstruction based on extensive historical research and documented sources about Emily Warren Roebling‘s life and work. Whilst Emily’s biographical details, technical contributions to the Brooklyn Bridge construction, and the engineering challenges she faced are grounded in historical records, her specific responses and conversational style are interpretive reconstructions designed to illuminate her remarkable achievements and perspective. The technical details about bridge construction, materials science, and 19th-century engineering practices reflect documented historical facts, but the dialogue itself is fictional, created to honour her legacy whilst making her story accessible to contemporary readers interested in engineering history and women’s contributions to STEM fields.